Melbourne & Geelong enquiries · Local availability confirmed before bookingCall us: 0419 549 683
Five-stage building inspections · Melbourne & Geelong

Before you open the door to your new home

From slab to front door, we’ll guide you through your build.

Building a home can feel overwhelming, especially if it’s your first time. We’ll be there at five key stages to inspect the work, explain what we find in plain English, and give you a clear report so you know what to raise with your builder. You’ll have someone in your corner from the first inspection to handover.

Book the full five-stage package, a single inspection, or the remaining stages of your build.

Enquire about your next stage
Steve Cover at the front door after a new-home inspection
Steve Cover · Inline Building Inspections

What we inspect at each stage

  1. Pre-slab. Inspect accessible footing and slab preparation, reinforcement and service penetrations before concrete is poured.
  2. Frame. Review visible framing, bracing and connections while they are accessible.
  3. Pre-plaster. Check accessible framing, service openings and flashing details before linings conceal them.
  4. Waterproofing. Review accessible wet-area details at an agreed time before they are covered.
  5. Pre-handover. Record visible defects, incomplete work and items requiring attention before you accept the home.
Window and brickwork junction inspected before internal linings
Window flashing detail identified during a pre-plaster inspection.

Plan your inspections around the build

Send us the site address, current stage and the next date your builder has given you. We’ll confirm availability, access and the scope before booking. After each visit, you receive a written record of findings with photographs.

These owner-commissioned inspections supplement the mandatory inspections arranged by your building surveyor.

Get a quote for your build

Prefer to talk through the timing? Call 0419 549 683.